Friday, September 21, 2012

AMZ last SC UL

This rod project was in queue at least for 4 months before kicked off. Another UL blank from St Croix with slight modification on its' length.



And here are the components used. A simple 'Black and Red" theme.



Configuring the handles before shaping the EVA handle.
                                                                    


Then the shaped EVA handle was test fitted before gluing.



When I was about to start the guide wrapping, I had a second look at it and it looks incomplete to me. Something was missing....



I just have to get the winding check in the fore grip...



Had another look and now it was complete.



Then for the guides.



1 coat of epoxy..



After the 3rd coat of epoxy and a few days for curing.... the rod is done.















No comments:

Post a Comment